location: South Ghawar
Scope
The Project Scope under this Contract, BI-10-14331:
South Ghawar UR – Early Works, includes, but is not
limited to:
• Site Preparation for Gas Separation Plant & other areas
• Site Preparation and transportation to site all required
development for SAPMT’s Temporary Construction
Facilities (TCF)
• Asphalt Main Road connecting Khurais Road with
GSP/OSF which ends by the Main Entrance
• Concrete sidewalks and foundation and perimeter fence
Access Road: Asphalt Road connecting Main Road with
SAMPT’s TCF
Contractor: Abdul Mohsen A.H. Al Tamimi
Client